The afternoon of day 1 has been underway and is moving...not super fast...but moving! While the men have been working and making noise below, I have been able to clean out my cupboards in the kitchen and have been working on my pictures. Later tonight I am going to tackle Grady's room as it is time to shuffle through his clothes and take out what he has outgrown. What a perfect time to do this since he is at Grandpa/ma Moseley's house for the night.
As I said, the men have been hard at work. They have only needed to make one quick run to the local hardware store and only had to call their dad for tools once. Always a good sign! Below is a picture that I took while I was standing in the "doorway" of the new room and looking SW towards the stairs that lead upstairs. We have construction materials and stuff everywhere! The paneling on the wall is what we took off in the other room.

This is a view from the stairs looking into the basement. The yellow sheet in the
right hand corner has been or makeshift "door" into the east side of our basement. As you can see we have the furnace right in the front room...so it's not a very pretty site.

Jon and Darren are building the first wall. This wall will separate the two rooms.

More building...see all of the dust that is in the air right now. Goodness!

Our wall is at least in the upright position. It is not in place yet as they are working on the other wall and need some extra space. They also built this wall with such precision that they needed some type of big hammer to knock it into place - so they called their dad.

Steve to the rescue! He brought over the tools they needed! I teased Steve that he came right over because Grady was driving him crazy - but he said I was wrong. He said that Grady has been a very good boy and is at his house building with blocks.

They have been trying to measure for the next wall and the floor is not even and is giving them problems...the solution for the three men...drinks!